After the steel plate is produced from the original factory, it will pass through a series of transportation and storage links and then be delivered to the processing workshop. During this period of time, the steel plate surface will contact with the air continuously, which will inevitably produce a layer of oxide skin. The oxide skin is a difficulty in the treatment process. It has high melting point, is not easy to burn and dissolve, increases preheating time, reduces cutting speed. Therefore, the surface of the StE380 carbon steel plate should be derusted before cutting.
Hot Rolled Plates StE380 carbon steel MachiningAfter final forging/forming and Heat treatment process, all the pipe Fittings, Flanges, Fasteners, Etc. are sent for machining i.e. and preparation, O/D and I/D matching as per dimensional codes. An Expert Q.C. engineer is involved and he keeps constant vigil on every machining operation. Step machining is carried out as required by the codes. GO and NO-GO gauges are used to check the O/D & I/D of the fittings, Flanges, etc.
When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.
Email:bb@bebonchina.com
Tel:0086-371-86151827
Skype:bebonchina