1. The first step of H-beam component manufacturing is setting out and blanking. If the component processing quality fails to meet the requirements, the construction work will be affected, resulting in quality problems in the building. Therefore, blanking of H-beam must be carried out in strict accordance with the drawings.
2. There are three main ways to connect H-beam: one is welding of steel, the other is bolt connection, the third is rivet connection. Welding is the main way to make components, and the welding quality is related to the use quality of the whole building. Therefore, professional welding personnel are required to complete the welding work, which must be fully welded without missing welding.
3. The biggest feature of H-beam steel building is assembly type. The components processed in the factory are directly transported to the construction site for installation. If there is any problem in the installation quality, not only the quality of the whole project will be greatly reduced, but also the site construction accident may be caused. Therefore, during the installation, it is necessary to follow the process steps to ensure the stability and reinforcement of the H-beam project.
Email:bb@bebonchina.com
Tel:0086-371-86151827
Skype:bebonchina